Cable Stayed Bridge

Piacenza d’Adige - 2006 - 2007

This 310m length cable stayed two lanes highway bridge has a concrete-steel mixed deck.
The main tripods are reinforced concrete structures, while the cable fixations are steel elements.

Technical Sheet
Performed service
Tender, preliminar and final structural design consultant for RPA Engineering Consultans S.r.l.
Client
«Autostrada Brescia Verona Vicenza Padova» joint-stock company
Year
2006 - 2007
Dimensional parameters
Total Span 310m
Structural work cost
30.000.000 €

Articles

Photogallery

MJW structures

We design large scale and spatial integrated structures.