This 45.5m length cable stayed pedestrian bridge has a 6.4m width deck. All cables supporting the deck are fixed to the 25m high steel pylon with variable cross-section, built up by RHS steel profiles.

The pylon go through the deck without giving to it any possible restrain and it is stabilized by two cables at its back. The lateral stabilization is guaranteed by two windbracing frames that are parts of the access stairs.

Technical Sheet
Performed service
Final structural design
Client
Property of Piraeus Port
Year
2006 - 2007
Dimensional parameters
Total Span 45.5m
Structural work cost
1.000.000 €